Pavement investigation runway and apron

Malta International Airport has been open for commercial traffic for over 50 years. The present air terminal building was constructed during the period 1989/91.  
Under authority of Malta International Airport plc a pavement investigation has been performed at runway 06-24, runway14-32 and the main apron.  
Falling-weight deflection measurements and visual condition surveys were conducted at the pavement structures.  
In a pavement analysis the strength (bearing capacity) of the current pavement structures were deteremined and recommendations for the rehablitation measures were stated.  
The services of Unihorn included falling-weight deflection measurements, visual condition surveys, structural pavement analysis and determination of rehabilitation measures.

Departments involved:
  • Planning & Design
  • Pavement consultancy
  • Survey

Projectdetails

Opdrachtgever Malta International Airport Plc.
Projectnaam Pavement investigation runway and apron
Locatie Malta International Airport
Activiteit Internationaal (verhardingen)
Periode uitvoering 2000/10 - 2001/06
Oplevering 2001
Gefactureerd bedrag $ 59.720,--